Behind on Orders? Have a Bottleneck? Can’t Keep Up with Demand?

Get Your First Lean Line Running, Eliminate Bottlenecks, and Catch Up on Orders in 90 Days.

I help manufacturers eliminate bottlenecks, cut lead times in half, and transform chaotic production into flowing lean operations. Whether you’re running high-volume lines or high-mix operations with 50+ products, I specialize in hands-on implementation that gets real results—fast.


99% of manufacturers are at Level 1 of THE LEANLINE PATH™—my 7-level system for transforming chaos into world-class production. If this is you, you’re in the right place.fast.

Level 1: Get Your First Lean Line Running

Does this describe your operation?

☑ Behind on orders, constantly firefighting
☑ Bottleneck in [machine/department] limiting your throughput
☑ Lead times way too long (weeks when competitors quote days)
☑ Missing delivery dates (customers angry or threatening to leave)
☑ Changeover times killing you (1-3 hours to switch between products)
☑ Can’t find materials when needed (warehouse full, but stockouts at cells)
☑ Quality inconsistent (depends which operator makes it or which shift)
☑ Too much work-in-process everywhere (money sitting on the shop floor)
☑ Schedule is pure chaos (expediting everything, no real plan)
☑ Every operator does it their own way (no standard methods, tribal knowledge)
☑ Can’t take on new business (maxed out, need capacity but can’t afford equipment)
☑ Growing but drowning (more orders = more chaos)

This is Level 1: Get Your First Lean Line. This is where I focus. Everything on this website—the free manual, the training articles, my consulting services—is designed to help you transform ONE line from this chaos to flowing lean production

What Happens After Level 1:

Once your first line is running smoothly, we can expand to 3-5 lines (Level 2), then facility-wide transformation (Level 3+). But that’s not today’s problem. Today’s problem is getting your first line under control so you can catch up on orders and stop firefighting.


THE PROBLEM

Sound Familiar?

❌ “We want to do lean, but we don’t know where to start”
❌ “We tried lean before. It didn’t stick”
❌ “Every consultant tells us something different”
❌ “We’re overwhelmed. We need a clear path”
❌ “We can’t afford expensive consultants forever”
❌ “Our team doesn’t believe lean will work here”

“We’re 2-6 months behind on orders and can’t catch up.”

The line is maxed out, everyone’s working overtime, but you’re still falling further behind. Customers threatening to leave.

“We have a bottleneck in [machine/department] limiting everything.”

One operation is slower than everything else. Work piles up. The whole facility is limited by that one constraint.

“Lead times are killing us—competitors quote 2 weeks, we need 6.”

You’re losing bids because you can’t compete on delivery speed. Sales brings in orders you can’t fulfill fast enough.

“Changeovers take 1-3 hours. It’s killing our productivity.”

Switching between products eats half the day. You make smaller batches to stay flexible, but setup time destroys efficiency.

“Materials are in the warehouse but we have stockouts at cells.”

Operators spend 30% of their time searching for parts. You have inventory but can’t find it when needed. Pure chaos.

“Quality is inconsistent—depends who makes it.”

Same product, different results by operator or shift. Rework eating your margins. Customers complaining about defects.

“Schedule is chaos. We’re expediting everything.”

No real plan—just reacting to whoever yells loudest. Everything is “urgent.” Nothing actually gets done on time.

“Every operator does it their own way.”

No standard methods. Tribal knowledge. Training new people takes 6-8 weeks. When Joe’s out sick, quality drops.

“We need more capacity but can’t afford new equipment.”

Growing but drowning. Sales wants to take on new customers but you’re maxed out. Can’t justify capex for more machines.

If any of these sound familiar, you’re in the right place.


Which Path Are You On?

HIGH-VOLUME / LOW-MIX

(Traditional Lean)

YOUR SITUATION:

  • 1-10 products
  • Batch sizes: 100s-1000s
  • Dedicated production lines
  • Repetitive, stable demand
  • Traditional lean methods work well

WHAT YOU NEED:

  • Traditional lean tools
  • Dedicated cells for each product
  • SMED for model changeovers
  • Kanban pull systems
  • Standard work (one best method)

HIGH-MIX / LOW-VOLUME

(Specialized Approach)

YOUR SITUATION:

  • 50-500+ products
  • Batch sizes: 1-100 units
  • Shared equipment across products
  • Products change multiple times/day
  • Traditional lean often fails

WHAT YOU NEED:

  • Flexible cells for product families
  • SMED for daily changeovers
  • Mixed-model scheduling
  • Standard work for variable processes
  • HMLV-specific methodology

No Death by PowerPoint. No 5S Police. Just Practical Problem-Solving

I’ve seen lean consulting done wrong too many times. Here’s how I do it differently.

THE TRADITIONAL APPROACH

(This Creates Resistance)

5 days in a conference room
50-slide PowerPoint presentations
400-page binder to take home
$50K spent, nothing changes

OR

“5S Police” with clipboards
Walk the floor pointing at everything “wrong”
Take away radios and toolboxes
Create resentment, not buy-in

MY APPROACH

(That Builds Buy-In)

Straight to the shop floor
Pick ONE real problem
Solve it together this week
Measure results next week

AND

Ask operators what’s in their way
Involve them in solving problems
They help design the solutions
Results make their jobs easier
They become lean advocates

The difference is simple:

Traditional lean consulting treats operators as the problem to be fixed. I treat operators as problem-solvers with valuable expertise.

When operators help design solutions to problems they actually care about, they don’t resist lean—they champion it.

“I told Nick my biggest frustration: I spent all day, every day kitting parts for the console assembly line. Just running around pulling screws and small parts. Never had time for actual shipping and receiving work—my real job.

Nick didn’t hand me a procedure or tell me to work faster. He asked what would make my job easier. Together we added tip-out bins at each station for the different screws assemblers needed. Then he set up kanban pick carts with two weeks of materials.

**Now I pull parts one day every two weeks instead of all day, every day.** I actually have time to focus on shipping and receiving. When I have free time, I restock the carts. Simple change, massive difference.”

That’s the first time a lean project actually made my life easier instead of adding more work.”

— Logistics Coordinator, Manufacturing Facility

What Operators Tell Me:

After working together, operators consistently say:

✓ “You didn’t waste our time in classrooms”
✓ “You actually listened to what we said was broken”
✓ “The changes made our jobs easier, not harder”
✓ “You didn’t treat us like we were the problem”
✓ “We understand lean now because we DID it, not because we sat through slides”

That’s the difference between lean that lasts and lean that fails.


The LeanLine Path™: Your Journey From Chaos to World-Class

Whether high-volume or high-mix, the journey is the same: Get your first line lean, then expand. Most manufacturers spend 1-2 years transforming their first line—and that’s perfectly normal. You can’t skip steps.

LEVEL 1: PROVE IT

Fix your worst line in 5 days

Transform one production line from chaos to flowing lean production.

What you’ll achieve: → 40-50% productivity improvement
→ Lead time reduced by 50-70% (weeks to days)
→ Changeover time cut in half (or better)
→ Quality consistent (standardized processes)
→ On-time delivery above 95%
→ Visible proof lean works in YOUR facility
→ Team energized and ready for more

Timeline: 90 days for quick wins, 6-12 months for complete transformation
Investment: $15K-40K depending on scope

LEVEL 2: SUSTAIN IT

Make it stick for 90 days

→ Ensure gains don’t fade
→ Build daily accountability systems
→ Train your first internal facilitator

LEVEL 3: REPLICATE IT

Prove you can do it again

→ Transform your second line
→ Your facilitator leads (we coach)
→ Prove the methodology transfers

LEVEL 4: SCALE IT

Transform 5-10 lines

→ Multi-year transformation roadmap
→ Train 3-5 internal facilitators
→ Continuous improvement program launched

LEVEL 5: EXPAND IT

Beyond the production floor

→ Warehouse optimization
→ Quality lab improvement
→ Office process improvement
→ End-to-end value stream optimized

LEVEL 6: EMBED IT

Build the culture

→ Daily improvement (not just quarterly projects)
→ Leaders coaching (not just directing)
→ Self-sustaining continuous improvement

LEVEL 7: MASTER IT

Become the teacher

→ Teaching other facilities
→ Industry recognition
→ Benchmark for others

FOCUS ON LEVEL 1 FIRST

Focus on Level 1 first. Everything else comes after you’ve proven lean works on the line. Let’s get that first win together.


Choose Your Path Forward

NEED HELP NOW

We’ll discuss your specific situation and I’ll recommend the best approach.

Perfect if you’re behind on orders and need help fast

LEARN FIRST

The complete Baseline → LeanLine → ProfitLine methodology for transforming your first production line. Includes 5-day Kaizen framework, templates, facilitator scripts, and real case study.

Perfect if you want to understand the complete methodology before we talk.

EXPLORE OPTIONS

Quick wins on specific challenges:

  • Cut changeover times
  • Design flexible cells
  • Create standard work
  • Build pull systems
  • Schedule mixed-model

Perfect if you want to learn specific concepts first

All three paths lead to the same place: working together to transform your operation. Pick the path that matches your timeline and learning style.


Four Ways to Work Together

1. REMOTE COACHING PACKAGE – $3,700

Expert guidance without the travel costs. Perfect when you have the team to implement but need expert direction to ensure you get it right.

What you get:

– 10 hours of one-on-one coaching (typically five 2-hour sessions over 3 months)

– Unlimited email support between sessions for quick Q&A

– Custom templates, calculators, and implementation tools

– Clear action plans with accountability checks

Ideal for: Specific challenges like changeover reduction, cell design, standard work implementation, or material flow optimization—in either high-volume or high-mix environments.


2. WEEKEND WARRIOR EVENT – $9,500 (+ Travel) The “Zero Downtime” Transformation.

Focused 2-day on-site sessions for breakthrough results on a specific problem. Perfect for facilities that cannot afford to shut down production during the week.

What you get:

– Saturday-Sunday Intensive: We execute the physical transformation while the line is idle (or slow)

– Monday Morning Launch: Your team walks in on Monday to a new, more efficient process.

– No Lost Revenue: We do the messy work (moving equipment, taping floors, reorganizing) without interrupting your weekday production schedule.

Ideal for: High-demand lines where every minute of weekday uptime counts.


3. WEEK-LONG KAIZEN EVENT – Starting at $18,500 (+ Travel)

Complete system transformation in 5 days. We go from “current state” to “future state” in one week.

What you get:

– Monday-Friday on-site intensive

– End-to-end transformation: analyze, design, build, train, launch

– Deep knowledge transfer: your team works alongside me

– Fully operational system by Friday afternoon

Ideal for: Comprehensive solutions. Transforming an entire production cell or area completely


4. FULL CONSULTING PROJECTS – Custom Pricing

Month-long (or longer) intensive engagements for facility-wide transformation

What you get:

– Multi-week or multi-month on-site work

– Multiple cells/areas transformed sequentially

– Complete methodology transfer to your internal champions

– Sustaining systems and culture change

Ideal for: Ideal for: Level 1 complete facility transformation or Level 2+ expansion across multiple lines.


WHY WORK WITH ME

Deep Manufacturing Experience, Hands-On Implementation

I’m not an academic or theorist. I’m a manufacturing professional who’s lived in your world.

My background:

  • Manufacturing Engineer, R&D Engineer, Quality Engineer
  • Production Manager, Logistics Manager, Director of Operations
  • Hands-on experience transforming production lines across multiple industries

My approach:

“I don’t do classroom training. I do hands-on implementation. We work together on your shop floor to transform your operation. You learn by doing, not by listening to PowerPoint presentations.”

I’VE BEEN IN YOUR SHOES

The 8-10 Months Behind Experience

Early in my career as Director of Operations, I walked into a facility that was 8-10 months behind on every single order. Customers were furious. The team was demoralized. Leadership was desperate.

I diagnosed the problem in 3 days: They’d grown too fast without building quality systems or lean foundations. No product families. No standard work. No pull systems. Just chaos.

I started implementing—product families, standard work, pull systems. We made real progress. Lead times dropped 40% in the first few months.

But my boss wasn’t bought in. He wanted results without changing processes. He wanted the benefits of lean without doing lean. After 3 months of fighting for resources and commitment, I left.

What I learned:

Results matter more than methodology purity. I’m pragmatic over perfect. Whatever gets your line flowing and your customers happy.

Without management support, don’t start. Now I only work with leaders who are genuinely committed—that’s why management commitment is my first qualifying question.

Lean must be hands-on and respectful. Not conference rooms. Not checklists. Not 5S police. Real problem-solving with real operators.

Current focus:

I’m actively developing specialized expertise in high-mix/low-volume manufacturing—an underserved market where traditional lean often fails. HMLV facilities face unique challenges (50+ products, daily changeovers, variable demand) that require different solutions than high-volume repetitive work.

Whether you need:

  • Traditional lean for high-volume operations
  • OR specialized HMLV methodology for high-mix environments

I bring practical experience and a results-focused approach.You learn by doing, not by listening to PowerPoint presentations.”


WHO I HELP BEST

You’re a Great Fit If:

✓ Manufacturing 1-500+ different products (I work across the volume spectrum)

✓ Behind on orders OR want to prevent getting behind

✓ Leadership genuinely committed to transformation (not looking for quick fixes without changing how work is done)

✓ Willing to involve your team (lean is participative, not top-down mandates)

✓ Want hands-on implementation (not just consulting reports or PowerPoint presentations)

✓ Ready for 90+ day commitment (real transformation takes time, not overnight miracles)

You’re NOT a Great Fit If:

✗ Only want classroom training (I do implementation, not theory lectures)

✗ Expect overnight miracles (transformation takes 90+ days minimum)

✗ Leadership won’t commit to changes (without management support, lean fails—I learned this the hard way)

✗ Not willing to involve operators (lean requires their expertise and buy-in)

✗ Looking for the cheapest option (quality implementation has real value)

If you’re in the “Great Fit” category, let’s talk.

If you’re in the “NOT a Great Fit” category, I’ll be honest with you—and that honesty will save us both time and money.


Ready to Stop Firefighting and Get Your First Lean Line Running?

Most manufacturers struggle alone for years before asking for help. Don’t wait until the customer crisis forces your hand.

Whether you book a consultation, download the manual, or browse training articles—take the first step today.